Monday, August 22, 2011

MPHIL CALICUT UNIVERSITY 2011-12

APPLICATION INVITED FOR MPHIL IN VARIOUS TEACHING DEPARTMENTS OF CALICUT UNIVERSITY.LAST DATE SEPT 12.
ELIGIBILITY: MASTERS DEGREE WITH 55%.
THERE WILL BE AN ENTRANCE TEST FOR THE ADMISSION WHICH WILL BE OBJECTIVE TYPE,50 MARKS OF 2 HOUR EXAM.APPLICATION FORM AND MORE DETAILS ARE AVAILABLE ON www.calicutuniversity.info

READ MORE: TIFR PHD ADMISSION
                         NATIONAL ELIGIBILITY TEST


Friday, August 12, 2011

APPLICATION INVITED FOR UGC CSIR NET EXAMINATION DEC2011

APPLICATION INVITED FOR  NET/JRF EXAMINATION DEC 2011.



A. Date of Single MCQ Examination 18.12.2011
B. Schedule for sale of Information Bulletin through Bank
(i) Start of sale of Information Bulletin  16.08.2011
(ii) Date of close of sale of Information Bulletin by post only  30.08.2011
(iii)Date of close of sale of Information Bulletin by cash at all branches/ stations  05.09.2011
C. Schedule for On-Line Application
(i) Start of On-Line Submission of Application Form and Fee deposit through Bank Challan 16.08.2011
(ii) Date of close of On-Line deposit of fee (at All stations)  05.09.2011
(iii)Date of close of On-Line submission of Applications (at All stations)  06.09.2011


D. Last date of receipt of completed application forms (including duly completed hard
copy of on line application in the Examination Unit
09.09.2011
E. Last date of receipt of (both kind) Completed application forms (from remote areas) 16.09.2011
F. Last Date for receipt of written request for change of Examination Centre only on merit basis 03.10.2011
G. Publication of list of candidates registered for test on CSIR, HRDG website 01.11.2011
H. Last date for entertainment of any representation about non-registration for this test 08.11.2011
I. Start of dispatch of Admission Certificate to eligible candidates last week of Nov., 2011

3. DATE AND SCHEME OF THE TEST
The single paper MCQ based test will be held on Sunday, the 18th December, 2011 as under:
Morning Session
Afternoon Session
To enable the candidates to go through the questions, the question paper booklet shall be distributed 15 minutes before
the scheduled time of the exam. The Answer sheet shall be distributed at the scheduled time of the exam.
The Question Booklet for this test will be printed in Hindi & English Version separately. The candidate opting for Hindi
medium in Column No. 5 of Application Form, will be supplied Question Booklet printed in bilingual and Candidate
opting for English medium, will be supplied Question Booklet printed in English Version only. The candidate will be
required to answer as per option exercised in Column No.5 of application Form.
3.2 SYLLABUS OF THE TEST
The question paper shall be divided into three parts, (A, B & C) as per syllabus & Scheme of Exam.
# Part 'A' shall be common to all subjects. This part shall contain questions pertaining to General Science, Quantitative
Reasoning & Analysis and Research Aptitude.
# Part 'B' shall contain subject-related conventional Multiple Choice questions (MCQs), generally covering the topics
given in the syllabus.
# Part 'C' shall contain higher value questions that may test the candidate's knowledge of scientific concepts and/or
application of the scientific concepts. The questions shall be of analytical nature where a candidate is expected to apply
the scientific knowledge to arrive at the solution to the given scientific problem.
# Negative marking for wrong answers, wherever required, shall be applicable as per scheme of Exam.




4. EXAMINATION CENTRES
The test will be held at 26 Centres spread all over India, as specified below:
Bangalore, Bhavnagar, Bhopal, Bhubaneshwar, Chandigarh, Chennai, Cochin, Delhi, Guntur, Guwahati, Hyderabad,
Imphal, Jammu, Jamshedpur, Karaikudi, Kolkata, Lucknow, Nagpur, Pilani, Pune, Raipur Roorkee, Srinagar,
Thiruvananthapuram, Udaipur and Varanasi.
A candidate may opt for any of the above centres. No request for change of centre would ordinarily be granted. However, a
request in writing for change of Centre may be entertained on merits, if received in this unit latest by 03.10.2011. If sufficient
number of candidates do not opt for any of the above Centres, that particular Centre may stand deleted from the above list OR
otherwise also, the concerned candidates may be allotted another Centre nearest to their place of residence, at the discretion of
CSIR. 
EXAM TIME
(i) Life Sciences
(ii) Mathematical Sciences
200M  9.00AM-12.00PM
3 hrs
Subject Marks Timings Duration
(i) Chemical Sciences
(ii) Earth, Atmospheric, Ocean and Planetary
Sciences
(iii) Physical Sciences
200M
2.00 PM-5.00 PM
3 hrs

For more details visit www.csirhrdg.res.in

Candidates applying for the Test may obtain the Information Bulletin and Application forms (inclusive of fee payable) through
the branches of the Bank notified below in para 5.4 (within the prescribed dates) by paying the following fee in cash:
Sr.No. CATEGORY FEES
1. General Rs. 400/-
2. Other Backward Classes(OBC) (Non Creamy Layer) Rs. 200/-
3. SC/ST/Physically Handicapped (PH) or Visually Handicapped (VH ) Rs. 100/-





READ MORE   :MODEL QUESTION
                            :TIPS TO PASS NET
                            :EXAM PATTERN

Monday, August 1, 2011

NATIONAL INSTITUTE FOR INTERDISCIPLINARY SCIENCE AND TECHNOLOGY(NIIST),TRIVANDRUM-PROJECT ASSISTANT

APPLICATION INVITED FOR PROJECT ASSISTANTS IN NATIONAL INSTITUTE FOR 
INTERDISCIPLINARY SCIENCE AND TECHNOLOGY TRIVANDRUM.
 MSC PHYSICS,MSC CHEMISTRY/MATERIAL SCIENCE,MCA,MSC COMPUTER 
SCIENCE QUALIFIED CANDIDATES CAN APPLY.
LAST DATE FOR SUBMISSION OF APPLICATION IS 19TH AUGUST.MSC PHYSICS 
CANDIDATES CAN APPLY CATEGORY 111 (PROJECT ASSISTANT GR11).
STIPEND WILL BE 12000/MONTH.
CANDIDATES SHOULD SUBMIT THEIR APPLICATION IN PLAIN PAPER CONTAINING 
1.NAME OF THE POST WITH CATEGORY 2.NAME OF THE CANDIDATE 3.DOB 4.FATHERS NAME 5.POSTAL ADDRESS 6.CATEGORY(SC/ST/OBC) 7.GENDER 8.QUALIFICATION WITH EXPERIENCE .9) Particulars of relatives working in CSIR or any of its labs/Instts 10)Details of engagement in CSIR or any of its Labs/Instts 11)Whether dismissed or debarred from Govt/Public Service 12)Declaration : Certified that the information given above is correct and true to facts 13) Signature of the candidate with date along with attested copies of testimonials to The Administrative Officer,NIIST,Thiruvananthapuram-695019 SHOULD REACH ON OR BEFORE 19 TH AUGUST


READ MORE : CSIR UGC RESULT JUNE 2011
                          :UGC MODEL QUESTION
                           :SET KERALA TIPS TO PASS

Tuesday, July 26, 2011

CENTRAL TEACHER ELIGIBILITY TEST (CTET)RESULT PUBLISHED

THE RESULT OF THE FIRST CTET CONDUCTED BY CBSE FOR RECRUITMENT OF TEACHERS TO CENTRAL GOVERNMENT SCHOOLS PUBLISHED ON 26TH JULY.97919 CANDIDATES CLEARED THE EXAM HELD ON JUNE 26TH.

FOR RESULT CLICK HERE

Sunday, July 17, 2011

SET 2011- KERALA APPLICATION INVITED

APPLICATION FORM WILL BE AVAILABLE FROM HEAD POST OFFICES FROM 18-7-11.LAST DATE TO GET FORM IS 17-8-11.LAST DATE OF RECEIPT OF APPLICATION FORM IS 17-8-11.
ELIGIBILITY:
APPLICANTS SHOULD POSSES PG+BED IN RESPECTIVE SUBJECTS.THOSE WHO ARE FINAL YEAR IN PG AFTER BED AND THOSE WHO ARE DOING BED 2010-11 ALSO CAN APPLY.
THIS YEAR  EXAMINATION WILL BE CONDUCTED BY LBS CENTRE.NEGATIVE MARKS WILL BE THERE FOR WRONG ANSWERS .
 THERE WILL BE TWO PAPERS.ONE WITH SUBJECT AND THE OTHER WITH TEACHING APTITUDE ,GENERAL KNOWLEDGE AND GENERAL AWARENESS.
EXAM DATE IS 25-9-11

SUGGESTED READINGS
                                        
                                          1 : SET EXAM TIPS AND PATTERN
                                          2. SET SYLLABUS
                                          3.TIPS TO PASS UGC CSIR EXAMINATION(NET-JRF)
                                         









Saturday, July 16, 2011

CHANDRAYAN 2 THE DREAM OF INDIAN SCIENTISTS

Chandrayaan-2 will be India's second mission to the Moon lanuched by Indian Space Research Organisation (ISRO) in 2013. It is the second unmanned lunar exploration mission proposed by the ISRO at a projected cost of Rs. 425 crore (US$ 90 million. The mission includes a lunar orbiter as well as a Lander/Rover. ISRO plans to land a motorised rover on the Moon likely in 2012, as a part of its second Chandrayaan mission. The wheeled rover will move on the lunar surface, to pick up soil or rock samples for on site chemical analysis. The data will be sent to Earth through Chandrayaan II, which will be in lunar orbit.
History of Chandrayaan-2
The Indian Government approved this mission on 18 September 2008. On November 12, 2007, representatives of the Russian Federal Space Agency (Roskosmos) and ISRO signed an agreement for the two agencies to work together on the Chandrayaan-2 project. In November 2007, the Indian Space Research Organisation (ISRO) and Russia's Federal Space Agency(Roskosmos) have signed an Agreement on joint lunar research and exploration. ISRO will have the prime responsibility for the Orbiter and Roskosmos will be responsible for the Lander/Rover.
Specification of Chandrayaan-2
Chandrayaan II will consist of the spacecraft itself and a landing platform with the Moon rover. The rover will weight 58 kg, with six wheels and running on solar power. It is of Russian design and will land near one of the poles and will survive for a year, roving up to 150 km at a speed of 360 m/h. The platform with the rover will detach from the orbiter after the spacecraft reaches its orbit above the Moon, and land on 
lunar soil. Then the rover will roll out of the platform. It will be launched on India's Geosynchronous Satellite Launch Vehicle (GSLV) around 2011-12 time frame. The craft will most likely be launched by 2013. The Chandrayaan 2 is expected to be operational in the next two years, after the life of the existing Chandrayaan 1 almost comes to an end.
Chandrayaan-2 Design
The initial phase of the Chandrayaan design is completed in Aug, 20, 2009. The Chandrayaan 2 mission will consist of a lunar rover that will be dropped on to the lunar surface once the craft reaches the 
lunar orbit. The main duty of the rover would be to collect and analyze lunar soil and transmit the data back to the data centers on earth. Pertinent to note here is the fact that while the spacecraft would be indigenously made, the lunar rover will be made by Russia. Since the design phase of Chandrayaan-2 is completed, we would be seeing a prototype of the Chandrayaan 2 soon. In the next two years, work on the spacecraft is expected to continue at a steady pace till the day of the launch.


SUGGESTED TOPICS TO READ MORE :CHANDRAYAN 1

Thursday, July 14, 2011

CHANDRAYAN-1 A START TO INDIAN WORK

In Ancient India language Sanskrit "Chandrayaan" means "Moon Craft" or Moon Vehicle. Chandrayaan-1 is India's first mission to the Moon launched by India's national space agency the Indian Space Research Organisation (ISRO). In Chandrayaan-1, the lunar craft launched using Polar Satellite Launch Vehicle (PSLV) weighing 1304 kg at launch and 590 kg at lunar orbit. Lunar craft would orbit around moon 100 km from moon surface. The unmanned lunar exploration mission includes a lunar orbiter and an impactor. India launched the spacecraft by a modified version of the PSLV, PSLV C11 on 22 October 2008 from Satish Dhawan Space Centre, Sriharikota, Nellore District, Andhra Pradesh about 80 km north of Chennai. The mission is a major boost to India's space program, as India competes with Asian nations China and Japan in exploring the Moon. The vehicle was successfully inserted into lunar orbit on 8 November 2008.

Succesful Launched of Chandryaan 1
On November 14, 2008, the Moon Impact Probe separated from the Moon-orbiting Chandrayaan at 20:06 and impacted the lunar south pole in a controlled manner, making India the fourth country to place its flag on the Moon.[8] The MIP impacted near the crater Shackleton, at the lunar south pole, at 20:31 on 14 November 2008 releasing subsurface debris that could be analysed for presence of water ice.
Cost of the Chadrayaan 1 Project
The estimated cost for the Chandrayaan 1 project is Rs. 386 crore (US$ 80 million).
Features of Chandrayaan 1
The remote sensing lunar satellite had a weight of 1,380 kilograms (3,042 lb) at launch and 675 kilograms (1,488 lb) in lunar orbit and carries high resolution remote sensing equipment for visible, near infrared, and soft and hard X-ray frequencies. Over a two-year period, it is intended to survey the lunar surface to produce a complete map of its chemical characteristics and 3-dimensional topography. The polar regions are of special interest, as they might contain ice. The lunar mission carries five ISRO payloads and six payloads from other international space agencies including NASA, ESA, and the Bulgarian Aerospace Agency, which were carried free of cost.


SUGGESTED ARTICLES TO READ MORE: CHANDRAYAN 2

Wednesday, July 13, 2011

MERCURY-THE PLANET

The planet Mercury is the closest to the Sun and is now the smallest planet in our Solar System. The temperatures on Mercury range from 700 degrees Kelvin on the sunlight side to 90 degrees Kelvin on the night side. Mercury orbits the Sun once every 88 days and rotates on its axis once every 58 days. The orbit of Mercury is very elliptical and brings it as close to the Sun as 46 million kilometers and as far away from the Sun as 70 million kilometers. Since it is so close to the Sun, Mercury can only be seen from Earth during the early morning or evening twilight.
We can observe Mercury from the Earth using both optical and radio telescopes, but much of what we know about Mercury is the result of three fly bys performed by theMariner 10 spacecraft during the 1970s. The Mariner 10 only photographed 40 to 45 percent of the surface of Mercury and the rest has never been seen up close. The photographs the Mariner 10 did send back reveled a rocky, cratered surface similar to the Earths own Moon.
Mercury is about 4878 kilometers in diameter and this makes Mercury slightly smaller than the moons Ganymede and Titan. However, Mercury is more than twice a massive thanks to its relatively high density that is second only to the Earths. This high density is the result of Mercurys inner structure which has a relatively large iron core that may be all or partly molten. The large iron core also generates a weak magnetic field about 1 percent as strong as the Earths. Despite being weak this magnetic field allows Mercury to maintain a very thin atmosphere in what is called the magnetosphere. The magnetic field does this by deflecting the solar wind.
Up until 1962 it was belived that Mercury rotated on its axis once each time it orbited the Sun. This would mean that one side of Mercury would always face the Sun the same way one side of Earths Moons always faces the Earth. Doppler radar observation conducted in 1965 showed this is not so. Mercury actually rotates on its axis three times during the course of two of its orbits around the Sun. This has some rather odd effects especially when combined with Mercurys highly elliptical orbit. If you were standing on Mercury you would see the Sun rise and then grow larger in size. The Sun would then stop in its journey across the sky and reverse its course. After back tracking a ways the Sun would then stop again and resume its original course. The Sun would then appear to shrink in size and drop below the horizon.
The orbit of Mercury gets even stranger as a result of being to close to the Sun where the Suns gravitational field is incredibly strong. As Mercury orbits the Sun the point where Mercury starts a new orbit moves slightly. This is called the precession of perihelion and it can not be explained using Newtonian physics. For a while it was hypothesized that another planet, that was even named Vulcan, was exerting its gravitational pull on Mercury and this was causing the precession of perihelion. This was proved false and the existence of Vulcan was dismissed when Albert Einsteins General Theory of Relativity provided a better explanation.
At present, Mercury is the least studied of the planets but that will soon change. On August 3, 2005 NASA launched a new mission to Mercury named MESSENGER which stands for Mercury Surface Space Environment geochemistry and Ranging. The MESSENGER spacecraft will make three fly bys of Mercury in January 2008, October 2008 and September 2009. The MESSENGER spacecraft will then settle into orbit around Mercury in March 2011. Japan and the European Space Agency are also planning a joint mission to Mercury called BepiColombo which will arrive at Mercury in the year 2019. These spacecraft will use a variety of scientific instruments to tell us more about all aspects of the planet Mercury.